大香网伊人久久综合网2020_97久久国产亚洲精品超碰热_久久香蕉国产视频_久久午夜福利无码1000合集

Page Options
>> >>view
Main Tower of Jiya Waterway Grand Bridge topped out
2025-05-07

The main tower of the Jiya Waterway Grand Bridge, a key structure of the Shenzhen-Jiangmen Railway, was topped out on May 1, marking the commencement of the steel beam erection phase for the bridge's main structure.


0507-1.jpg


The Jiya Waterway Grand Bridge spans 6,896.185 meters, with its main bridge situated between Minzhong Sub-district (Torch Development Zone) and Gangkou Town.


The 788.9-meter main bridge is a double-pylon double-cable-plane composite beam cable-stayed bridge. It is China's first long-span high-speed railway cable-stayed bridge featuring double-sided steel-concrete composite box girder construction.


The main towers reach 140 meters, equivalent to a 47-story building.

Close】 【Print
ICP?Registration?Number:?粵ICP備?11005604號
Police?Registration?Number:?44200002442868
Website?ID:?4420000052
Sponsored?by:??Office?of?Zhongshan?Municipal?People's?Government
Technical?Support:???Information?Center?of?Zhongshan
Without?written?authorization?from??Zhongshan?Municipal?People’s?Government,?the?content?of?the?site?shall?not?be?republished?or?used?in?any?form.
About Us | Site Map| Privacy Statement| Contact us